UAB“Irlanda” executes concreting works in industrial, public, manufacturing and special purpose projects of various sizes: logistic centers, warehouses, factories, trade centers, car parking places and etc. The acquisition of the whole range of the latest concrete floor laying technology allows the company to achieve more quality, speed and efficiency simultaneously. Moreover, it creates mobility and flexible working conditions while adjusting to the pace and flow of the project.
UAB“Irlanda” is the oficial representative of IFT Fasertechnik Gmbh in Lithuania. Engineering office in Germany provide structural designs for very different applications: from special purpose buildings, tunnels, bridges, industrial floors to residential and commercial buildings. High-grade, quality-tested products, a process technology and service that match the latest state of technical art – that is our corporate philosophy.
Engineering design and the technology in possession allow to lay concrete floors with tradicional expansion joints and apply the most advanced techniques in laying jointless floors, when large concrete floor areas are laid only with a few construction joints. In this way, the floor’s exploitation properties are improved and maintenance costs are reduced.
TOP projects fulfiled:
- GLC logistic park (Vilnius, 18000 sq.m.);
- IKI logistic center (Panevezys, 35000 sq.m.);
- SENUKAI logistic center (Kaunas, 54600sq.m.);
- FINEJAS logistic center (Vievis, 8500sq.m.);
- MEGRAME factory (Trakai, 31500sq.m.);
- UAB "Finnfoam" gamykla (Kaunas, 11600 sq. m.);
- TC "MEGA" (Kaunas, 72000sq.m.);
- TC "Banginis" (Kaunas, 13700 sq.m.);
- TC "MAXIMA" (Lithuania, Latvia, 40000sq.m.).
Equipment in use:
UAB “Irlanda” owns the whole range of equipment needed to ensure continuous, properly and timely fulfilled works:
 |
Laser Screeds (SOMERO X-treme Platform, CopperHead, 2005/2008)
“X-treme Platform“ max screed area - 22.3 sqm per 45 sec. Possibility to mount from 1000 sqm to 5000 sqm per day. |
| "Copperhead" screeding machine is meant for small areas and upper floors areas. Possibility to mount from 100 sqm to 1000 sqm per day |

|
 |
Topping Spreader (SOMERO STS-132, 2007)
|
| Steel fibre dispersing and dosing systems (DINO, 2007) |
 |
  |
Concrete polishing trowels |
|
Saw cutting machines (including early entry dry cutting system SOFF-CUT, 2008)
|
 |
|